The ITAC Statistics page displays the average assessment results for the selected criteria.
7
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $348k | 75k |
MMBtu
|
$5.14 |
- Electrical | $242k | 5,983k |
kWh
|
$0.053 |
- Natural Gas | $57k | 13k |
MMBtu
|
$3.47 |
49
Recommendations
7.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $21k | 3.8k |
MMBtu
|
5.0% |
- Electrical | $20k | 366k |
kWh
|
6.1% |
- Natural Gas | ($-1.1)k | - |
MMBtu
|
- |
Waste | $0.5k | |||
Productivity/Other | $40k | |||
TOTAL | $61k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
7
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $348k | 75k |
MMBtu
|
$5.14 |
- Electrical | $242k | 5,983k |
kWh
|
$0.053 |
- Natural Gas | $57k | 13k |
MMBtu
|
$3.47 |
16
Implemented Recommendations
2.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $6.5k | 1.5k |
MMBtu
|
2.0% |
- Electrical | $5.6k | 143k |
kWh
|
2.4% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | $0.3k | |||
Productivity/Other | $2.9k | |||
TOTAL | $9.7k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |