ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Tires and inner tubes
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,855k 507k
MMBtu
$6.41
- Electrical $1,496k 35,307k
kWh
$0.058
- Natural Gas $804k 143k
MMBtu
$4.32

261

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $518k 90k
MMBtu
17.7%
- Electrical $325k 8,619k
kWh
24.4%
- Natural Gas ($-7.1)k -
MMBtu
-
Waste $22k
Productivity/Other ($-134.9)k
TOTAL $405k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,936k 523k
MMBtu
$6.40
- Electrical $1,543k 36,692k
kWh
$0.058
- Natural Gas $822k 145k
MMBtu
$4.32

112

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $64k 7.6k
MMBtu
1.4%
- Electrical $25k 585k
kWh
1.6%
- Natural Gas $29k -
MMBtu
-
Waste $14k
Productivity/Other $7.9k
TOTAL $86k
*May be negative reflecting an increased cost component required to save energy and costs overall