ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Products of petroleum and coal, not elsewhere classified
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,970k 436k
MMBtu
$5.12
- Electrical $497k 9,978k
kWh
$0.054
- Natural Gas $1,360k 333k
MMBtu
$4.83

41

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $402k 48k
MMBtu
11.1%
- Electrical $230k 4,712k
kWh
47.2%
- Natural Gas $168k -
MMBtu
-
Waste $10k
Productivity/Other $929k
TOTAL $1,341k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,970k 436k
MMBtu
$5.12
- Electrical $497k 9,978k
kWh
$0.054
- Natural Gas $1,360k 333k
MMBtu
$4.83

24

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 3.8k
MMBtu
0.9%
- Electrical $19k 375k
kWh
3.8%
- Natural Gas $63k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $82k
*May be negative reflecting an increased cost component required to save energy and costs overall