ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Asphalt felts and coatings
3+ Characters Required for Products

66

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $853k 151k
MMBtu
$6.16
- Electrical $318k 5,592k
kWh
$0.062
- Natural Gas $419k 83k
MMBtu
$4.84

500

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 5.7k
MMBtu
3.8%
- Electrical $32k 559k
kWh
10.0%
- Natural Gas $45k -
MMBtu
-
Waste $17k
Productivity/Other $51k
TOTAL $159k
*May be negative reflecting an increased cost component required to save energy and costs overall

66

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $853k 151k
MMBtu
$6.16
- Electrical $318k 5,592k
kWh
$0.062
- Natural Gas $419k 83k
MMBtu
$4.84

281

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 2.3k
MMBtu
1.5%
- Electrical $14k 222k
kWh
4.0%
- Natural Gas $19k -
MMBtu
-
Waste $3.3k
Productivity/Other $30k
TOTAL $69k
*May be negative reflecting an increased cost component required to save energy and costs overall