ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Asphalt felts and coatings
3+ Characters Required for Products

68

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $859k 149k
MMBtu
$6.56
- Electrical $324k 5,632k
kWh
$0.065
- Natural Gas $408k 81k
MMBtu
$4.79

510

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 6.1k
MMBtu
4.1%
- Electrical $34k 597k
kWh
10.6%
- Natural Gas $43k -
MMBtu
-
Waste $16k
Productivity/Other $50k
TOTAL $157k
*May be negative reflecting an increased cost component required to save energy and costs overall

67

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $866k 151k
MMBtu
$6.25
- Electrical $324k 5,697k
kWh
$0.062
- Natural Gas $414k 82k
MMBtu
$4.86

283

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 2.2k
MMBtu
1.5%
- Electrical $14k 219k
kWh
3.8%
- Natural Gas $18k -
MMBtu
-
Waste $3.2k
Productivity/Other $30k
TOTAL $68k
*May be negative reflecting an increased cost component required to save energy and costs overall