ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Asphalt paving mixtures and blocks
3+ Characters Required for Products

79

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $652k 115k
MMBtu
$7.09
- Electrical $151k 1,859k
kWh
$0.088
- Natural Gas $293k 75k
MMBtu
$3.87

511

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $117k 3.6k
MMBtu
3.1%
- Electrical $31k 350k
kWh
18.8%
- Natural Gas $33k -
MMBtu
-
Waste $1.4k
Productivity/Other $45k
TOTAL $163k
*May be negative reflecting an increased cost component required to save energy and costs overall

69

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $639k 117k
MMBtu
$6.92
- Electrical $141k 1,799k
kWh
$0.087
- Natural Gas $293k 76k
MMBtu
$3.94

210

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 1.9k
MMBtu
1.6%
- Electrical $15k 185k
kWh
10.3%
- Natural Gas $6.0k -
MMBtu
-
Waste $1.1k
Productivity/Other $31k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall