ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Asphalt paving and roofing materials
3+ Characters Required for Products

133

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $750k 135k
MMBtu
$6.60
- Electrical $232k 3,698k
kWh
$0.076
- Natural Gas $355k 79k
MMBtu
$4.34

925

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 4.6k
MMBtu
3.4%
- Electrical $31k 448k
kWh
12.1%
- Natural Gas $38k -
MMBtu
-
Waste $9.2k
Productivity/Other $50k
TOTAL $165k
*May be negative reflecting an increased cost component required to save energy and costs overall

129

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $759k 137k
MMBtu
$6.57
- Electrical $235k 3,784k
kWh
$0.074
- Natural Gas $356k 80k
MMBtu
$4.30

471

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 2.1k
MMBtu
1.5%
- Electrical $15k 206k
kWh
5.4%
- Natural Gas $12k -
MMBtu
-
Waste $2.3k
Productivity/Other $32k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall