ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Asphalt paving and roofing materials
3+ Characters Required for Products

148

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $745k 130k
MMBtu
$6.87
- Electrical $230k 3,590k
kWh
$0.077
- Natural Gas $344k 77k
MMBtu
$4.26

1,029

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 4.7k
MMBtu
3.7%
- Electrical $32k 463k
kWh
12.9%
- Natural Gas $38k -
MMBtu
-
Waste $8.2k
Productivity/Other $47k
TOTAL $160k
*May be negative reflecting an increased cost component required to save energy and costs overall

136

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $741k 133k
MMBtu
$6.57
- Electrical $227k 3,636k
kWh
$0.075
- Natural Gas $352k 79k
MMBtu
$4.34

498

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 2.1k
MMBtu
1.6%
- Electrical $15k 202k
kWh
5.6%
- Natural Gas $12k -
MMBtu
-
Waste $2.2k
Productivity/Other $31k
TOTAL $77k
*May be negative reflecting an increased cost component required to save energy and costs overall