ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Asphalt paving and roofing materials
3+ Characters Required for Products

146

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $748k 131k
MMBtu
$6.83
- Electrical $232k 3,628k
kWh
$0.077
- Natural Gas $346k 78k
MMBtu
$4.29

1,018

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 4.8k
MMBtu
3.7%
- Electrical $33k 469k
kWh
12.9%
- Natural Gas $38k -
MMBtu
-
Waste $8.3k
Productivity/Other $46k
TOTAL $160k
*May be negative reflecting an increased cost component required to save energy and costs overall

134

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $745k 134k
MMBtu
$6.59
- Electrical $229k 3,674k
kWh
$0.075
- Natural Gas $352k 79k
MMBtu
$4.34

483

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 2.1k
MMBtu
1.6%
- Electrical $15k 203k
kWh
5.5%
- Natural Gas $12k -
MMBtu
-
Waste $2.2k
Productivity/Other $31k
TOTAL $77k
*May be negative reflecting an increased cost component required to save energy and costs overall