The ITAC Statistics page displays the average assessment results for the selected criteria.
202
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $2,307k | 417k |
MMBtu
|
$6.50 |
- Electrical | $806k | 12,986k |
kWh
|
$0.071 |
- Natural Gas | $1,279k | 238k |
MMBtu
|
$4.56 |
1,443
Recommendations
7.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $193k | 6.8k |
MMBtu
|
1.6% |
- Electrical | $41k | 664k |
kWh
|
5.1% |
- Natural Gas | $112k | - |
MMBtu
|
- |
Waste | $6.6k | |||
Productivity/Other | $75k | |||
TOTAL | $275k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
194
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $2,363k | 428k |
MMBtu
|
$6.48 |
- Electrical | $826k | 13,322k |
kWh
|
$0.070 |
- Natural Gas | $1,319k | 245k |
MMBtu
|
$4.60 |
701
Implemented Recommendations
3.6
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $72k | 2.2k |
MMBtu
|
0.5% |
- Electrical | $14k | 217k |
kWh
|
1.6% |
- Natural Gas | $34k | - |
MMBtu
|
- |
Waste | $1.6k | |||
Productivity/Other | $29k | |||
TOTAL | $103k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |