Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous chemical products
3+ Characters Required for Products

202

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,037k 210k
MMBtu
$7.65
- Electrical $333k 7,395k
kWh
$0.068
- Natural Gas $594k 133k
MMBtu
$5.55

1,561

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $123k 10k
MMBtu
4.8%
- Electrical $59k 986k
kWh
13.3%
- Natural Gas $44k -
MMBtu
-
Waste $9.0k
Productivity/Other $32k
TOTAL $163k
*May be negative reflecting an increased cost component required to save energy and costs overall

192

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,018k 207k
MMBtu
$7.49
- Electrical $323k 7,434k
kWh
$0.067
- Natural Gas $589k 129k
MMBtu
$5.47

735

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $55k 4.8k
MMBtu
2.3%
- Electrical $26k 468k
kWh
6.3%
- Natural Gas $23k -
MMBtu
-
Waste $1.2k
Productivity/Other $4.7k
TOTAL $61k