ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fertilizers, mixing only
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $601k 143k
MMBtu
$5.87
- Electrical $349k 11,346k
kWh
$0.058
- Natural Gas $115k 23k
MMBtu
$4.30

66

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 7.4k
MMBtu
5.2%
- Electrical $28k 723k
kWh
6.4%
- Natural Gas $14k -
MMBtu
-
Waste $24k
Productivity/Other $20k
TOTAL $94k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $705k 169k
MMBtu
$5.76
- Electrical $417k 13,755k
kWh
$0.056
- Natural Gas $136k 28k
MMBtu
$4.64

35

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 7.6k
MMBtu
4.5%
- Electrical $25k 742k
kWh
5.4%
- Natural Gas $8.7k -
MMBtu
-
Waste -
Productivity/Other ($-0.2)k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall