ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Phosphatic fertilizers
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,051k 350k
MMBtu
$4.49
- Electrical $681k 28,577k
kWh
$0.035
- Natural Gas $233k 58k
MMBtu
$0.81

27

Recommendations

5.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $752k 239k
MMBtu
68.1%
- Electrical $728k 23,280k
kWh
81.5%
- Natural Gas $16k -
MMBtu
-
Waste -
Productivity/Other $2,139k
TOTAL $2,891k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,051k 350k
MMBtu
$4.49
- Electrical $681k 28,577k
kWh
$0.035
- Natural Gas $233k 58k
MMBtu
$0.81

13

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 4.4k
MMBtu
1.3%
- Electrical $19k 428k
kWh
1.5%
- Natural Gas $16k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall