ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nitrogenous fertilizers
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,329k 695k
MMBtu
$7.28
- Electrical $856k 25,372k
kWh
$0.053
- Natural Gas $1,275k 410k
MMBtu
$6.23

41

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 8.4k
MMBtu
1.2%
- Electrical $29k 816k
kWh
3.2%
- Natural Gas $19k -
MMBtu
-
Waste $0.0k
Productivity/Other $82k
TOTAL $141k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,699k 810k
MMBtu
$4.96
- Electrical $997k 29,573k
kWh
$0.048
- Natural Gas $1,485k 478k
MMBtu
$4.93

16

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.1k
MMBtu
0.3%
- Electrical $9.1k 201k
kWh
0.7%
- Natural Gas $12k -
MMBtu
-
Waste $0.0k
Productivity/Other $1.9k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall