ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paints, varnishes, lacquers, enamels, and allied
3+ Characters Required for Products

94

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $438k 83k
MMBtu
$7.76
- Electrical $222k 4,629k
kWh
$0.067
- Natural Gas $138k 35k
MMBtu
$5.39

752

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 3.4k
MMBtu
4.1%
- Electrical $23k 334k
kWh
7.2%
- Natural Gas $18k -
MMBtu
-
Waste $7.7k
Productivity/Other $26k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall

92

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $389k 76k
MMBtu
$7.77
- Electrical $196k 4,248k
kWh
$0.067
- Natural Gas $128k 32k
MMBtu
$5.43

352

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.5k
MMBtu
1.9%
- Electrical $10k 142k
kWh
3.3%
- Natural Gas $3.9k -
MMBtu
-
Waste $3.3k
Productivity/Other $17k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall