ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Soap, detergents, and cleaning preparations; perfumes, cosmetics, and other toilet preparations
3+ Characters Required for Products

141

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $621k 522k
MMBtu
$7.86
- Electrical $304k 5,026k
kWh
$0.070
- Natural Gas $218k 469k
MMBtu
$5.23

1,069

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $93k 10k
MMBtu
1.9%
- Electrical $61k 982k
kWh
19.5%
- Natural Gas $23k -
MMBtu
-
Waste $5.6k
Productivity/Other $36k
TOTAL $134k
*May be negative reflecting an increased cost component required to save energy and costs overall

133

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $602k 545k
MMBtu
$7.72
- Electrical $293k 4,766k
kWh
$0.069
- Natural Gas $218k 496k
MMBtu
$5.15

502

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.1k
MMBtu
0.8%
- Electrical $25k 402k
kWh
8.4%
- Natural Gas $15k -
MMBtu
-
Waste $0.9k
Productivity/Other $17k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall