ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC In vitro and in vivo diagnostic substances
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $496k 59k
MMBtu
$8.79
- Electrical $360k 4,686k
kWh
$0.078
- Natural Gas $53k 8.7k
MMBtu
$4.90

106

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $62k 6.5k
MMBtu
11.2%
- Electrical $54k 638k
kWh
13.6%
- Natural Gas ($-4.0)k -
MMBtu
-
Waste -
Productivity/Other $9.4k
TOTAL $71k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $496k 59k
MMBtu
$8.79
- Electrical $360k 4,686k
kWh
$0.078
- Natural Gas $53k 8.7k
MMBtu
$4.90

53

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.6k
MMBtu
2.8%
- Electrical $14k 159k
kWh
3.4%
- Natural Gas $0.4k -
MMBtu
-
Waste -
Productivity/Other $1.1k
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall