ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pharmaceutical preparations
3+ Characters Required for Products

154

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,227k 180k
MMBtu
$7.95
- Electrical $702k 11,849k
kWh
$0.065
- Natural Gas $271k 48k
MMBtu
$5.92

1,170

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $177k 20k
MMBtu
11.1%
- Electrical $124k 1,947k
kWh
16.4%
- Natural Gas $10k -
MMBtu
-
Waste $14k
Productivity/Other $92k
TOTAL $283k
*May be negative reflecting an increased cost component required to save energy and costs overall

146

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,244k 186k
MMBtu
$7.44
- Electrical $707k 12,184k
kWh
$0.062
- Natural Gas $282k 51k
MMBtu
$5.62

473

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 6.2k
MMBtu
3.4%
- Electrical $48k 608k
kWh
5.0%
- Natural Gas $11k -
MMBtu
-
Waste $6.8k
Productivity/Other $50k
TOTAL $127k
*May be negative reflecting an increased cost component required to save energy and costs overall