ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pharmaceutical preparations
3+ Characters Required for Products

167

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,183k 171k
MMBtu
$8.16
- Electrical $682k 11,313k
kWh
$0.067
- Natural Gas $258k 46k
MMBtu
$6.07

1,270

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $175k 19k
MMBtu
11.2%
- Electrical $120k 1,859k
kWh
16.4%
- Natural Gas $10k -
MMBtu
-
Waste $14k
Productivity/Other $93k
TOTAL $282k
*May be negative reflecting an increased cost component required to save energy and costs overall

157

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,222k 178k
MMBtu
$8.08
- Electrical $701k 11,703k
kWh
$0.066
- Natural Gas $269k 48k
MMBtu
$5.87

524

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $72k 6.2k
MMBtu
3.5%
- Electrical $49k 600k
kWh
5.1%
- Natural Gas $11k -
MMBtu
-
Waste $6.3k
Productivity/Other $48k
TOTAL $126k
*May be negative reflecting an increased cost component required to save energy and costs overall