ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pharmaceutical preparations
3+ Characters Required for Products

158

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,216k 177k
MMBtu
$8.05
- Electrical $700k 11,693k
kWh
$0.066
- Natural Gas $265k 48k
MMBtu
$5.90

1,208

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $179k 20k
MMBtu
11.1%
- Electrical $123k 1,916k
kWh
16.4%
- Natural Gas $10.0k -
MMBtu
-
Waste $15k
Productivity/Other $91k
TOTAL $285k
*May be negative reflecting an increased cost component required to save energy and costs overall

150

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,246k 183k
MMBtu
$7.91
- Electrical $713k 12,025k
kWh
$0.065
- Natural Gas $276k 50k
MMBtu
$5.82

492

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $73k 6.3k
MMBtu
3.4%
- Electrical $50k 610k
kWh
5.1%
- Natural Gas $11k -
MMBtu
-
Waste $6.6k
Productivity/Other $50k
TOTAL $130k