ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Medicinal chemicals and botanical products
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $397k 55k
MMBtu
$8.15
- Electrical $191k 3,740k
kWh
$0.066
- Natural Gas $113k 16k
MMBtu
$6.14

202

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 4.3k
MMBtu
7.8%
- Electrical $34k 420k
kWh
11.2%
- Natural Gas $7.5k -
MMBtu
-
Waste $4.6k
Productivity/Other $122k
TOTAL $177k
*May be negative reflecting an increased cost component required to save energy and costs overall

26

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $412k 57k
MMBtu
$7.94
- Electrical $198k 3,898k
kWh
$0.065
- Natural Gas $116k 17k
MMBtu
$6.19

73

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.6k
MMBtu
2.7%
- Electrical $13k 154k
kWh
3.9%
- Natural Gas $2.4k -
MMBtu
-
Waste $3.0k
Productivity/Other $29k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall