ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drugs
3+ Characters Required for Products

236

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,050k 154k
MMBtu
$8.52
- Electrical $597k 10,354k
kWh
$0.069
- Natural Gas $229k 40k
MMBtu
$6.02

1,746

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $146k 15k
MMBtu
10.0%
- Electrical $99k 1,495k
kWh
14.4%
- Natural Gas $8.6k -
MMBtu
-
Waste $18k
Productivity/Other $80k
TOTAL $244k
*May be negative reflecting an increased cost component required to save energy and costs overall

226

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,071k 158k
MMBtu
$8.37
- Electrical $608k 10,622k
kWh
$0.067
- Natural Gas $234k 41k
MMBtu
$5.84

741

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 5.1k
MMBtu
3.2%
- Electrical $39k 493k
kWh
4.6%
- Natural Gas $7.9k -
MMBtu
-
Waste $6.5k
Productivity/Other $39k
TOTAL $103k
*May be negative reflecting an increased cost component required to save energy and costs overall