ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drugs
3+ Characters Required for Products

227

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,070k 158k
MMBtu
$8.38
- Electrical $608k 10,618k
kWh
$0.068
- Natural Gas $233k 41k
MMBtu
$5.88

1,691

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $148k 16k
MMBtu
9.9%
- Electrical $101k 1,525k
kWh
14.4%
- Natural Gas $8.2k -
MMBtu
-
Waste $19k
Productivity/Other $82k
TOTAL $249k
*May be negative reflecting an increased cost component required to save energy and costs overall

217

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,085k 163k
MMBtu
$7.83
- Electrical $615k 10,913k
kWh
$0.065
- Natural Gas $241k 43k
MMBtu
$5.71

706

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 5.2k
MMBtu
3.2%
- Electrical $40k 502k
kWh
4.6%
- Natural Gas $8.1k -
MMBtu
-
Waste $6.7k
Productivity/Other $41k
TOTAL $106k
*May be negative reflecting an increased cost component required to save energy and costs overall