Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drugs
3+ Characters Required for Products

226

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,068k 158k
MMBtu
$8.38
- Electrical $606k 10,617k
kWh
$0.068
- Natural Gas $233k 41k
MMBtu
$5.90

1,676

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $148k 16k
MMBtu
9.9%
- Electrical $100k 1,524k
kWh
14.4%
- Natural Gas $8.2k -
MMBtu
-
Waste $18k
Productivity/Other $83k
TOTAL $249k
*May be negative reflecting an increased cost component required to save energy and costs overall

216

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,085k 163k
MMBtu
$7.82
- Electrical $616k 10,922k
kWh
$0.065
- Natural Gas $241k 43k
MMBtu
$5.67

702

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 5.2k
MMBtu
3.2%
- Electrical $40k 504k
kWh
4.6%
- Natural Gas $8.2k -
MMBtu
-
Waste $6.8k
Productivity/Other $40k
TOTAL $105k
*May be negative reflecting an increased cost component required to save energy and costs overall