ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drugs
3+ Characters Required for Products

232

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,056k 156k
MMBtu
$8.44
- Electrical $600k 10,456k
kWh
$0.068
- Natural Gas $230k 40k
MMBtu
$5.94

1,723

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $146k 15k
MMBtu
9.9%
- Electrical $99k 1,500k
kWh
14.3%
- Natural Gas $8.5k -
MMBtu
-
Waste $18k
Productivity/Other $82k
TOTAL $246k
*May be negative reflecting an increased cost component required to save energy and costs overall

221

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,079k 160k
MMBtu
$8.28
- Electrical $610k 10,754k
kWh
$0.067
- Natural Gas $237k 42k
MMBtu
$5.84

720

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 5.1k
MMBtu
3.2%
- Electrical $40k 499k
kWh
4.6%
- Natural Gas $8.0k -
MMBtu
-
Waste $6.6k
Productivity/Other $40k
TOTAL $105k
*May be negative reflecting an increased cost component required to save energy and costs overall