ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drugs
3+ Characters Required for Products

220

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,074k 161k
MMBtu
$7.91
- Electrical $609k 10,798k
kWh
$0.065
- Natural Gas $238k 42k
MMBtu
$5.80

1,632

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $142k 16k
MMBtu
9.8%
- Electrical $100k 1,543k
kWh
14.3%
- Natural Gas $8.3k -
MMBtu
-
Waste $19k
Productivity/Other $85k
TOTAL $246k
*May be negative reflecting an increased cost component required to save energy and costs overall

210

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,071k 161k
MMBtu
$7.76
- Electrical $605k 10,876k
kWh
$0.064
- Natural Gas $240k 41k
MMBtu
$5.73

660

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $55k 5.0k
MMBtu
3.1%
- Electrical $38k 488k
kWh
4.5%
- Natural Gas $8.2k -
MMBtu
-
Waste $6.9k
Productivity/Other $41k
TOTAL $103k
*May be negative reflecting an increased cost component required to save energy and costs overall