ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drugs
3+ Characters Required for Products

225

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,068k 159k
MMBtu
$8.31
- Electrical $605k 10,642k
kWh
$0.067
- Natural Gas $234k 41k
MMBtu
$5.91

1,667

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $144k 16k
MMBtu
9.9%
- Electrical $101k 1,527k
kWh
14.3%
- Natural Gas $8.3k -
MMBtu
-
Waste $18k
Productivity/Other $83k
TOTAL $246k
*May be negative reflecting an increased cost component required to save energy and costs overall

213

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,082k 164k
MMBtu
$7.73
- Electrical $610k 10,979k
kWh
$0.064
- Natural Gas $244k 43k
MMBtu
$5.70

680

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 5.1k
MMBtu
3.1%
- Electrical $38k 494k
kWh
4.5%
- Natural Gas $8.2k -
MMBtu
-
Waste $6.8k
Productivity/Other $41k
TOTAL $103k
*May be negative reflecting an increased cost component required to save energy and costs overall