Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics materials and synthetic resins, synthetic
3+ Characters Required for Products

167

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,951k 379k
MMBtu
$6.45
- Electrical $924k 19,854k
kWh
$0.096
- Natural Gas $695k 142k
MMBtu
$5.33

1,297

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $143k 11k
MMBtu
3.0%
- Electrical $64k 1,110k
kWh
5.6%
- Natural Gas $51k -
MMBtu
-
Waste $14k
Productivity/Other $24k
TOTAL $181k
*May be negative reflecting an increased cost component required to save energy and costs overall

165

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,971k 383k
MMBtu
$6.44
- Electrical $934k 20,049k
kWh
$0.096
- Natural Gas $703k 143k
MMBtu
$5.30

597

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 5.4k
MMBtu
1.4%
- Electrical $26k 529k
kWh
2.6%
- Natural Gas $15k -
MMBtu
-
Waste $8.0k
Productivity/Other $12k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall