ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial inorganic chemicals, not elsewhere classified
3+ Characters Required for Products

114

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,152k 450k
MMBtu
$6.25
- Electrical $842k 20,592k
kWh
$0.055
- Natural Gas $944k 193k
MMBtu
$6.83

846

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $206k 27k
MMBtu
5.9%
- Electrical $119k 2,598k
kWh
12.6%
- Natural Gas $38k -
MMBtu
-
Waste $8.4k
Productivity/Other $66k
TOTAL $280k
*May be negative reflecting an increased cost component required to save energy and costs overall

108

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,219k 467k
MMBtu
$6.10
- Electrical $856k 21,382k
kWh
$0.051
- Natural Gas $983k 199k
MMBtu
$6.98

365

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 3.5k
MMBtu
0.7%
- Electrical $14k 339k
kWh
1.6%
- Natural Gas $62k -
MMBtu
-
Waste $3.7k
Productivity/Other $27k
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall