ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Alkalies and chlorine
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,978k 1,298k
MMBtu
$6.12
- Electrical $4,356k 119,457k
kWh
$0.046
- Natural Gas $408k 73k
MMBtu
$3.81

68

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $142k 11k
MMBtu
0.9%
- Electrical $56k 1,086k
kWh
0.9%
- Natural Gas $82k -
MMBtu
-
Waste $13k
Productivity/Other $6.4k
TOTAL $161k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $6,600k 1,434k
MMBtu
$6.21
- Electrical $4,812k 132,399k
kWh
$0.041
- Natural Gas $439k 77k
MMBtu
$3.90

36

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 5.4k
MMBtu
0.4%
- Electrical $23k 525k
kWh
0.4%
- Natural Gas $28k -
MMBtu
-
Waste $0.9k
Productivity/Other $0.9k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall