ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Platemaking and related services
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $383k 72k
MMBtu
$6.84
- Electrical $246k 4,148k
kWh
$0.061
- Natural Gas $113k 29k
MMBtu
$6.72

58

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 3.6k
MMBtu
5.0%
- Electrical $21k 353k
kWh
8.5%
- Natural Gas $5.6k -
MMBtu
-
Waste $0.1k
Productivity/Other $8.0k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $383k 72k
MMBtu
$6.84
- Electrical $246k 4,148k
kWh
$0.061
- Natural Gas $113k 29k
MMBtu
$6.72

33

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.0k
MMBtu
1.4%
- Electrical $7.8k 97k
kWh
2.3%
- Natural Gas $7.3k -
MMBtu
-
Waste -
Productivity/Other $6.2k
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall