ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Typesetting
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $146k 15k
MMBtu
$10.01
- Electrical $72k 1,236k
kWh
$0.058
- Natural Gas $15k 1.9k
MMBtu
$8.15

10

Recommendations

10.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.5k 0.4k
MMBtu
3.0%
- Electrical $2.5k 43k
kWh
3.5%
- Natural Gas $2.1k -
MMBtu
-
Waste -
Productivity/Other $2.5k
TOTAL $7.0k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $146k 15k
MMBtu
$10.01
- Electrical $72k 1,236k
kWh
$0.058
- Natural Gas $15k 1.9k
MMBtu
$8.15

4

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.9k 0.3k
MMBtu
2.0%
- Electrical $1.7k 29k
kWh
2.3%
- Natural Gas $2.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $3.9k
*May be negative reflecting an increased cost component required to save energy and costs overall