ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Service industries for the printing trade
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $323k 59k
MMBtu
$7.09
- Electrical $206k 3,642k
kWh
$0.059
- Natural Gas $86k 22k
MMBtu
$6.36

79

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 3.0k
MMBtu
5.1%
- Electrical $18k 294k
kWh
8.1%
- Natural Gas $4.4k -
MMBtu
-
Waste $0.3k
Productivity/Other $27k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $323k 59k
MMBtu
$7.09
- Electrical $206k 3,642k
kWh
$0.059
- Natural Gas $86k 22k
MMBtu
$6.36

42

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 0.9k
MMBtu
1.5%
- Electrical $6.9k 87k
kWh
2.4%
- Natural Gas $5.7k -
MMBtu
-
Waste -
Productivity/Other $6.4k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall