ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Manifold business forms
3+ Characters Required for Products

44

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $224k 38k
MMBtu
$6.36
- Electrical $162k 3,180k
kWh
$0.055
- Natural Gas $23k 4.7k
MMBtu
$3.96

360

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 4.1k
MMBtu
10.8%
- Electrical $22k 396k
kWh
12.5%
- Natural Gas $5.5k -
MMBtu
-
Waste $15k
Productivity/Other $13k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall

44

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $224k 38k
MMBtu
$6.36
- Electrical $162k 3,180k
kWh
$0.055
- Natural Gas $23k 4.7k
MMBtu
$3.96

177

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.8k
MMBtu
4.8%
- Electrical $9.3k 178k
kWh
5.6%
- Natural Gas $4.6k -
MMBtu
-
Waste $4.6k
Productivity/Other $6.5k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall