ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing, not elsewhere classified
3+ Characters Required for Products

164

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $485k 72k
MMBtu
$8.02
- Electrical $284k 5,313k
kWh
$0.21
- Natural Gas $109k 18k
MMBtu
$5.69

1,205

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 4.5k
MMBtu
6.3%
- Electrical $26k 442k
kWh
8.3%
- Natural Gas $12k -
MMBtu
-
Waste $3.1k
Productivity/Other $45k
TOTAL $92k
*May be negative reflecting an increased cost component required to save energy and costs overall

161

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $488k 73k
MMBtu
$7.95
- Electrical $286k 5,365k
kWh
$0.22
- Natural Gas $111k 18k
MMBtu
$5.66

543

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.1k
MMBtu
2.8%
- Electrical $13k 201k
kWh
3.7%
- Natural Gas $8.5k -
MMBtu
-
Waste $1.0k
Productivity/Other $12k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall