ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing, gravure
3+ Characters Required for Products

23

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $742k 125k
MMBtu
$6.21
- Electrical $422k 7,446k
kWh
$0.059
- Natural Gas $221k 46k
MMBtu
$5.66

176

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 3.9k
MMBtu
3.1%
- Electrical $22k 377k
kWh
5.1%
- Natural Gas $24k -
MMBtu
-
Waste $4.1k
Productivity/Other $186k
TOTAL $249k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $742k 125k
MMBtu
$6.21
- Electrical $422k 7,446k
kWh
$0.059
- Natural Gas $221k 46k
MMBtu
$5.66

76

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.2k
MMBtu
1.7%
- Electrical $12k 211k
kWh
2.8%
- Natural Gas $10.0k -
MMBtu
-
Waste $3.9k
Productivity/Other $0.7k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall