ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing, lithographic
3+ Characters Required for Products

252

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $371k 58k
MMBtu
$7.87
- Electrical $220k 4,457k
kWh
$0.059
- Natural Gas $64k 12k
MMBtu
$5.37

1,905

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 5.2k
MMBtu
9.0%
- Electrical $30k 511k
kWh
11.5%
- Natural Gas $3.9k -
MMBtu
-
Waste $4.6k
Productivity/Other $37k
TOTAL $84k
*May be negative reflecting an increased cost component required to save energy and costs overall

250

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $371k 58k
MMBtu
$7.85
- Electrical $221k 4,471k
kWh
$0.059
- Natural Gas $65k 12k
MMBtu
$5.37

822

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.6k
MMBtu
2.8%
- Electrical $9.1k 159k
kWh
3.6%
- Natural Gas $1.7k -
MMBtu
-
Waste $1.3k
Productivity/Other $10k
TOTAL $25k