ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing
3+ Characters Required for Products

444

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $429k 66k
MMBtu
$7.82
- Electrical $253k 4,896k
kWh
$0.12
- Natural Gas $88k 16k
MMBtu
$5.50

3,315

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 4.9k
MMBtu
7.3%
- Electrical $28k 475k
kWh
9.7%
- Natural Gas $7.7k -
MMBtu
-
Waste $4.1k
Productivity/Other $47k
TOTAL $95k
*May be negative reflecting an increased cost component required to save energy and costs overall

439

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $431k 67k
MMBtu
$7.79
- Electrical $254k 4,922k
kWh
$0.12
- Natural Gas $89k 16k
MMBtu
$5.49

1,451

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.8k
MMBtu
2.7%
- Electrical $10k 176k
kWh
3.6%
- Natural Gas $4.6k -
MMBtu
-
Waste $1.3k
Productivity/Other $10k
TOTAL $29k