The ITAC Statistics page displays the average assessment results for the selected criteria.
434
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $430k | 67k |
MMBtu
|
$7.67 |
- Electrical | $253k | 4,960k |
kWh
|
$0.12 |
- Natural Gas | $90k | 16k |
MMBtu
|
$5.49 |
3,247
Recommendations
7.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $43k | 4.8k |
MMBtu
|
7.1% |
- Electrical | $27k | 467k |
kWh
|
9.4% |
- Natural Gas | $7.9k | - |
MMBtu
|
- |
Waste | $4.1k | |||
Productivity/Other | $47k | |||
TOTAL | $94k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
433
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $430k | 67k |
MMBtu
|
$7.67 |
- Electrical | $253k | 4,966k |
kWh
|
$0.12 |
- Natural Gas | $90k | 16k |
MMBtu
|
$5.50 |
1,426
Implemented Recommendations
3.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $17k | 1.8k |
MMBtu
|
2.7% |
- Electrical | $10k | 175k |
kWh
|
3.5% |
- Natural Gas | $4.6k | - |
MMBtu
|
- |
Waste | $1.3k | |||
Productivity/Other | $8.9k | |||
TOTAL | $28k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |