The ITAC Statistics page displays the average assessment results for the selected criteria.
18
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $381k | 74k |
MMBtu
|
$6.66 |
- Electrical | $230k | 6,132k |
kWh
|
$0.055 |
- Natural Gas | $39k | 10k |
MMBtu
|
$3.80 |
138
Recommendations
7.7
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $27k | 3.9k |
MMBtu
|
5.2% |
- Electrical | $19k | 377k |
kWh
|
6.2% |
- Natural Gas | $1.4k | - |
MMBtu
|
- |
Waste | $6.7k | |||
Productivity/Other | $233k | |||
TOTAL | $267k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
18
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $381k | 74k |
MMBtu
|
$6.66 |
- Electrical | $230k | 6,132k |
kWh
|
$0.055 |
- Natural Gas | $39k | 10k |
MMBtu
|
$3.80 |
52
Implemented Recommendations
2.9
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $11k | 1.6k |
MMBtu
|
2.1% |
- Electrical | $9.3k | 153k |
kWh
|
2.5% |
- Natural Gas | $0.3k | - |
MMBtu
|
- |
Waste | $5.9k | |||
Productivity/Other | $0.2k | |||
TOTAL | $17k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |