ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Books
3+ Characters Required for Products

50

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $512k 72k
MMBtu
$7.05
- Electrical $343k 5,735k
kWh
$0.063
- Natural Gas $81k 12k
MMBtu
$6.30

375

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 6.9k
MMBtu
9.6%
- Electrical $48k 672k
kWh
11.7%
- Natural Gas $12k -
MMBtu
-
Waste $4.3k
Productivity/Other $24k
TOTAL $95k
*May be negative reflecting an increased cost component required to save energy and costs overall

49

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $517k 73k
MMBtu
$7.07
- Electrical $346k 5,787k
kWh
$0.063
- Natural Gas $82k 12k
MMBtu
$6.29

197

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 4.5k
MMBtu
6.2%
- Electrical $33k 440k
kWh
7.6%
- Natural Gas $5.5k -
MMBtu
-
Waste $1.0k
Productivity/Other $18k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall