The ITAC Statistics page displays the average assessment results for the selected criteria.
50
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $512k | 72k |
MMBtu
|
$7.05 |
- Electrical | $343k | 5,735k |
kWh
|
$0.063 |
- Natural Gas | $81k | 12k |
MMBtu
|
$6.30 |
375
Recommendations
7.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $67k | 6.9k |
MMBtu
|
9.6% |
- Electrical | $48k | 672k |
kWh
|
11.7% |
- Natural Gas | $12k | - |
MMBtu
|
- |
Waste | $4.3k | |||
Productivity/Other | $24k | |||
TOTAL | $95k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
49
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $517k | 73k |
MMBtu
|
$7.07 |
- Electrical | $346k | 5,787k |
kWh
|
$0.063 |
- Natural Gas | $82k | 12k |
MMBtu
|
$6.29 |
197
Implemented Recommendations
4.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $42k | 4.5k |
MMBtu
|
6.2% |
- Electrical | $33k | 440k |
kWh
|
7.6% |
- Natural Gas | $5.5k | - |
MMBtu
|
- |
Waste | $1.0k | |||
Productivity/Other | $18k | |||
TOTAL | $61k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |