ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Newspaper
3+ Characters Required for Products

144

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $346k 49k
MMBtu
$7.35
- Electrical $240k 4,287k
kWh
$0.062
- Natural Gas $25k 4.3k
MMBtu
$5.26

1,080

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 6.8k
MMBtu
13.9%
- Electrical $35k 665k
kWh
15.5%
- Natural Gas ($-3.0)k -
MMBtu
-
Waste $3.8k
Productivity/Other $17k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall

143

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $348k 49k
MMBtu
$7.34
- Electrical $242k 4,309k
kWh
$0.062
- Natural Gas $26k 4.4k
MMBtu
$5.10

481

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 2.1k
MMBtu
4.3%
- Electrical $13k 205k
kWh
4.8%
- Natural Gas $1.0k -
MMBtu
-
Waste $1.1k
Productivity/Other $4.1k
TOTAL $21k
*May be negative reflecting an increased cost component required to save energy and costs overall