ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Printing, publishing, and allied industries
3+ Characters Required for Products

756

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $400k 61k
MMBtu
$7.53
- Electrical $250k 4,706k
kWh
$0.093
- Natural Gas $67k 12k
MMBtu
$5.33

5,668

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 5.2k
MMBtu
8.5%
- Electrical $30k 507k
kWh
10.8%
- Natural Gas $5.3k -
MMBtu
-
Waste $4.8k
Productivity/Other $40k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

749

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $402k 61k
MMBtu
$7.51
- Electrical $251k 4,727k
kWh
$0.093
- Natural Gas $68k 12k
MMBtu
$5.29

2,545

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.0k
MMBtu
3.3%
- Electrical $12k 197k
kWh
4.2%
- Natural Gas $3.6k -
MMBtu
-
Waste $1.6k
Productivity/Other $8.9k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall