ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Stationery, tablets, and related products
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $156k 25k
MMBtu
$7.43
- Electrical $98k 1,921k
kWh
$0.068
- Natural Gas $27k 4.2k
MMBtu
$6.79

51

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 1.9k
MMBtu
7.8%
- Electrical $8.8k 189k
kWh
9.8%
- Natural Gas ($-0.7)k -
MMBtu
-
Waste $1.1k
Productivity/Other $15k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $156k 25k
MMBtu
$7.43
- Electrical $98k 1,921k
kWh
$0.068
- Natural Gas $27k 4.2k
MMBtu
$6.79

22

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $6.2k 0.7k
MMBtu
3.0%
- Electrical $3.8k 73k
kWh
3.8%
- Natural Gas $2.1k -
MMBtu
-
Waste $0.9k
Productivity/Other $8.6k
TOTAL $16k