The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 2674 Uncoated paper and multiwall bags

35

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $313k 57k
MMBtu
$6.19
- Electrical $213k 4,328k
kWh
$0.057
- Natural Gas $56k 12k
MMBtu
$5.59

255

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 4.4k
MMBtu
7.7%
- Electrical $22k 426k
kWh
9.8%
- Natural Gas $5.2k -
MMBtu
-
Waste $3.1k
Productivity/Other $51k
TOTAL $87k
*May be negative reflecting an increased cost component required to save energy and costs overall

35

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $313k 57k
MMBtu
$6.19
- Electrical $213k 4,328k
kWh
$0.057
- Natural Gas $56k 12k
MMBtu
$5.59

117

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 2.3k
MMBtu
4.1%
- Electrical $11k 227k
kWh
5.2%
- Natural Gas $1.7k -
MMBtu
-
Waste $2.2k
Productivity/Other $21k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall