ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics, foil, and coated paper bags
3+ Characters Required for Products

63

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $747k 128k
MMBtu
$6.85
- Electrical $536k 11,242k
kWh
$0.059
- Natural Gas $59k 12k
MMBtu
$4.71

497

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 8.2k
MMBtu
6.4%
- Electrical $41k 799k
kWh
7.1%
- Natural Gas $4.7k -
MMBtu
-
Waste $59k
Productivity/Other $106k
TOTAL $221k
*May be negative reflecting an increased cost component required to save energy and costs overall

62

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $743k 128k
MMBtu
$6.81
- Electrical $534k 11,267k
kWh
$0.059
- Natural Gas $59k 12k
MMBtu
$4.65

245

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 3.5k
MMBtu
2.8%
- Electrical $18k 344k
kWh
3.1%
- Natural Gas $1.5k -
MMBtu
-
Waste $2.9k
Productivity/Other $5.5k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall