ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fiber cans, tubes, drums, and similar products
3+ Characters Required for Products

26

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $434k 75k
MMBtu
$7.12
- Electrical $255k 4,438k
kWh
$0.066
- Natural Gas $137k 27k
MMBtu
$6.17

169

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.4k
MMBtu
4.6%
- Electrical $24k 331k
kWh
7.5%
- Natural Gas $3.1k -
MMBtu
-
Waste $1.4k
Productivity/Other $55k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

26

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $434k 75k
MMBtu
$7.12
- Electrical $255k 4,438k
kWh
$0.066
- Natural Gas $137k 27k
MMBtu
$6.17

79

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 1.6k
MMBtu
2.1%
- Electrical $9.5k 153k
kWh
3.5%
- Natural Gas $1.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $19k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall