ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paperboard mills
3+ Characters Required for Products

47

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,471k 1,150k
MMBtu
$5.03
- Electrical $1,618k 37,778k
kWh
$0.047
- Natural Gas $1,310k 578k
MMBtu
$4.16

385

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $248k 31k
MMBtu
2.7%
- Electrical $116k 3,043k
kWh
8.1%
- Natural Gas $56k -
MMBtu
-
Waste $21k
Productivity/Other $9.2k
TOTAL $278k
*May be negative reflecting an increased cost component required to save energy and costs overall

45

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,328k 1,136k
MMBtu
$5.06
- Electrical $1,554k 36,328k
kWh
$0.048
- Natural Gas $1,248k 571k
MMBtu
$4.18

181

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $55k 3.6k
MMBtu
0.3%
- Electrical $15k 351k
kWh
1.0%
- Natural Gas $19k -
MMBtu
-
Waste $2.3k
Productivity/Other $6.6k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall