ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paperboard mills
3+ Characters Required for Products

48

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,407k 1,135k
MMBtu
$4.95
- Electrical $1,586k 37,039k
kWh
$0.047
- Natural Gas $1,289k 575k
MMBtu
$4.09

398

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $245k 31k
MMBtu
2.7%
- Electrical $115k 3,038k
kWh
8.2%
- Natural Gas $55k -
MMBtu
-
Waste $21k
Productivity/Other $9.0k
TOTAL $275k
*May be negative reflecting an increased cost component required to save energy and costs overall

46

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,265k 1,121k
MMBtu
$4.97
- Electrical $1,522k 35,589k
kWh
$0.048
- Natural Gas $1,228k 568k
MMBtu
$4.10

190

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 4.1k
MMBtu
0.4%
- Electrical $17k 404k
kWh
1.1%
- Natural Gas $19k -
MMBtu
-
Waste $2.3k
Productivity/Other $6.5k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall