Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paper mills
3+ Characters Required for Products

99

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,190k 878k
MMBtu
$6.66
- Electrical $1,786k 42,452k
kWh
$0.066
- Natural Gas $1,290k 269k
MMBtu
$5.32

742

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $313k 38k
MMBtu
4.3%
- Electrical $136k 3,701k
kWh
8.7%
- Natural Gas $37k -
MMBtu
-
Waste $36k
Productivity/Other $118k
TOTAL $467k
*May be negative reflecting an increased cost component required to save energy and costs overall

96

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,128k 877k
MMBtu
$6.66
- Electrical $1,767k 42,644k
kWh
$0.066
- Natural Gas $1,233k 260k
MMBtu
$5.30

364

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $141k 5.0k
MMBtu
0.6%
- Electrical $33k 490k
kWh
1.1%
- Natural Gas $31k -
MMBtu
-
Waste $8.9k
Productivity/Other $13k
TOTAL $163k
*May be negative reflecting an increased cost component required to save energy and costs overall