ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paper mills
3+ Characters Required for Products

100

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,418k 1,005k
MMBtu
$6.62
- Electrical $1,816k 44,024k
kWh
$0.066
- Natural Gas $1,278k 266k
MMBtu
$5.34

763

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $327k 38k
MMBtu
3.8%
- Electrical $136k 3,706k
kWh
8.4%
- Natural Gas $37k -
MMBtu
-
Waste $38k
Productivity/Other $126k
TOTAL $492k
*May be negative reflecting an increased cost component required to save energy and costs overall

97

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,364k 1,008k
MMBtu
$6.61
- Electrical $1,798k 44,262k
kWh
$0.066
- Natural Gas $1,222k 258k
MMBtu
$5.32

364

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $140k 5.0k
MMBtu
0.5%
- Electrical $33k 485k
kWh
1.1%
- Natural Gas $30k -
MMBtu
-
Waste $8.8k
Productivity/Other $13k
TOTAL $162k
*May be negative reflecting an increased cost component required to save energy and costs overall