ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pulp mills
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $15,906k 2,328k
MMBtu
$7.35
- Electrical $5,370k 108,980k
kWh
$0.052
- Natural Gas $8,262k 1,211k
MMBtu
$3.67

60

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $521k 18k
MMBtu
0.8%
- Electrical $121k 1,722k
kWh
1.6%
- Natural Gas $364k -
MMBtu
-
Waste -
Productivity/Other $7.0k
TOTAL $528k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $17,401k 2,521k
MMBtu
$7.71
- Electrical $5,719k 118,198k
kWh
$0.048
- Natural Gas $9,156k 1,309k
MMBtu
$4.01

25

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 7.9k
MMBtu
0.3%
- Electrical $29k 772k
kWh
0.7%
- Natural Gas $42k -
MMBtu
-
Waste -
Productivity/Other $1.9k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall