ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pulp mills
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $14,580k 2,144k
MMBtu
$7.07
- Electrical $4,905k 99,860k
kWh
$0.050
- Natural Gas $7,594k 1,121k
MMBtu
$3.72

70

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $486k 16k
MMBtu
0.7%
- Electrical $110k 1,568k
kWh
1.6%
- Natural Gas $343k -
MMBtu
-
Waste $7.3k
Productivity/Other $6.4k
TOTAL $500k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $15,793k 2,299k
MMBtu
$7.37
- Electrical $5,173k 107,244k
kWh
$0.046
- Natural Gas $8,332k 1,200k
MMBtu
$4.03

25

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $71k 7.1k
MMBtu
0.3%
- Electrical $26k 695k
kWh
0.6%
- Natural Gas $38k -
MMBtu
-
Waste -
Productivity/Other $1.7k
TOTAL $73k
*May be negative reflecting an increased cost component required to save energy and costs overall