ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paper and allied products
3+ Characters Required for Products

1,048

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,251k 264k
MMBtu
$6.82
- Electrical $585k 12,836k
kWh
$0.060
- Natural Gas $408k 92k
MMBtu
$5.17

8,196

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $107k 11k
MMBtu
4.3%
- Electrical $53k 1,099k
kWh
8.6%
- Natural Gas $25k -
MMBtu
-
Waste $14k
Productivity/Other $56k
TOTAL $177k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,020

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,249k 266k
MMBtu
$6.73
- Electrical $579k 12,806k
kWh
$0.060
- Natural Gas $412k 93k
MMBtu
$5.16

3,704

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 2.7k
MMBtu
1.0%
- Electrical $14k 261k
kWh
2.0%
- Natural Gas $12k -
MMBtu
-
Waste $3.0k
Productivity/Other $13k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall