ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paper and allied products
3+ Characters Required for Products

1,031

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,249k 265k
MMBtu
$6.77
- Electrical $581k 12,824k
kWh
$0.060
- Natural Gas $410k 92k
MMBtu
$5.19

8,091

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 11k
MMBtu
4.2%
- Electrical $51k 1,079k
kWh
8.4%
- Natural Gas $25k -
MMBtu
-
Waste $14k
Productivity/Other $56k
TOTAL $176k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,009

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,254k 268k
MMBtu
$6.62
- Electrical $582k 12,905k
kWh
$0.060
- Natural Gas $415k 94k
MMBtu
$5.15

3,673

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 2.7k
MMBtu
1.0%
- Electrical $14k 262k
kWh
2.0%
- Natural Gas $12k -
MMBtu
-
Waste $3.0k
Productivity/Other $13k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall