ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drapery hardware and window blinds and shades
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $377k 59k
MMBtu
$7.23
- Electrical $196k 4,261k
kWh
$0.054
- Natural Gas $97k 15k
MMBtu
$6.96

91

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.1k
MMBtu
7.0%
- Electrical $26k 401k
kWh
9.4%
- Natural Gas $7.8k -
MMBtu
-
Waste $34k
Productivity/Other $37k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $377k 59k
MMBtu
$7.23
- Electrical $196k 4,261k
kWh
$0.054
- Natural Gas $97k 15k
MMBtu
$6.96

45

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 2.0k
MMBtu
3.3%
- Electrical $11k 191k
kWh
4.5%
- Natural Gas $0.7k -
MMBtu
-
Waste $22k
Productivity/Other $16k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall