ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Partitions, shelving, lockers, and office and
3+ Characters Required for Products

85

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $253k 40k
MMBtu
$8.16
- Electrical $144k 2,412k
kWh
$0.072
- Natural Gas $63k 13k
MMBtu
$5.74

642

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 3.3k
MMBtu
8.2%
- Electrical $22k 319k
kWh
13.2%
- Natural Gas $5.7k -
MMBtu
-
Waste $8.8k
Productivity/Other $18k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall

81

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $257k 41k
MMBtu
$7.78
- Electrical $147k 2,462k
kWh
$0.070
- Natural Gas $65k 14k
MMBtu
$5.46

305

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.5k
MMBtu
3.6%
- Electrical $8.0k 145k
kWh
5.9%
- Natural Gas $3.1k -
MMBtu
-
Waste $2.0k
Productivity/Other $11k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall