ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 252 Office furniture

87

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $407k 59k
MMBtu
$7.44
- Electrical $233k 3,882k
kWh
$0.23
- Natural Gas $111k 18k
MMBtu
$5.22

618

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 4.1k
MMBtu
6.9%
- Electrical $26k 398k
kWh
10.2%
- Natural Gas $20k -
MMBtu
-
Waste $3.7k
Productivity/Other $27k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall

84

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $408k 60k
MMBtu
$7.39
- Electrical $235k 3,934k
kWh
$0.24
- Natural Gas $110k 18k
MMBtu
$5.14

282

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 1.8k
MMBtu
3.1%
- Electrical $12k 179k
kWh
4.6%
- Natural Gas $8.5k -
MMBtu
-
Waste $1.2k
Productivity/Other $16k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall