ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Mattresses, foundations, and convertible beds
3+ Characters Required for Products

41

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $303k 44k
MMBtu
$7.89
- Electrical $174k 3,357k
kWh
$0.066
- Natural Gas $58k 8.7k
MMBtu
$6.66

277

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 7.5k
MMBtu
17.3%
- Electrical $36k 734k
kWh
21.9%
- Natural Gas $8.3k -
MMBtu
-
Waste $2.6k
Productivity/Other $38k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

39

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $282k 43k
MMBtu
$7.68
- Electrical $166k 3,311k
kWh
$0.066
- Natural Gas $54k 8.4k
MMBtu
$6.52

139

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 3.5k
MMBtu
8.2%
- Electrical $11k 341k
kWh
10.3%
- Natural Gas $2.1k -
MMBtu
-
Waste $0.5k
Productivity/Other $32k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall