ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC Control pressure on steamer operations
NAICS 3+ Digits Required
SIC Mattresses, foundations, and convertible beds
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $287k 44k
MMBtu
$7.53
- Electrical $169k 3,431k
kWh
$0.064
- Natural Gas $56k 8.5k
MMBtu
$6.59

254

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 6.9k
MMBtu
15.5%
- Electrical $28k 669k
kWh
19.5%
- Natural Gas $9.1k -
MMBtu
-
Waste $2.5k
Productivity/Other $42k
TOTAL $95k
*May be negative reflecting an increased cost component required to save energy and costs overall

35

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $282k 44k
MMBtu
$7.32
- Electrical $164k 3,437k
kWh
$0.061
- Natural Gas $54k 8.6k
MMBtu
$6.06

127

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 3.7k
MMBtu
8.4%
- Electrical $11k 363k
kWh
10.6%
- Natural Gas $2.4k -
MMBtu
-
Waste $0.5k
Productivity/Other $35k
TOTAL $52k
*May be negative reflecting an increased cost component required to save energy and costs overall