ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal household furniture
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,187k 125k
MMBtu
$8.14
- Electrical $997k 9,766k
kWh
$0.074
- Natural Gas $146k 23k
MMBtu
$5.84

169

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $75k 3.7k
MMBtu
3.0%
- Electrical $27k 361k
kWh
3.7%
- Natural Gas $41k -
MMBtu
-
Waste $3.7k
Productivity/Other $81k
TOTAL $160k
*May be negative reflecting an increased cost component required to save energy and costs overall

21

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,236k 130k
MMBtu
$8.11
- Electrical $1,038k 10,176k
kWh
$0.073
- Natural Gas $151k 24k
MMBtu
$5.89

63

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.1k
MMBtu
0.9%
- Electrical $7.2k 108k
kWh
1.1%
- Natural Gas $1.0k -
MMBtu
-
Waste $1.2k
Productivity/Other $7.0k
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall