ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Household furniture
3+ Characters Required for Products

235

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $391k 61k
MMBtu
$7.40
- Electrical $258k 4,155k
kWh
$0.061
- Natural Gas $46k 7.2k
MMBtu
$6.07

1,658

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 6.0k
MMBtu
9.7%
- Electrical $32k 582k
kWh
14.0%
- Natural Gas $7.8k -
MMBtu
-
Waste $7.8k
Productivity/Other $27k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

227

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $395k 63k
MMBtu
$7.28
- Electrical $262k 4,224k
kWh
$0.060
- Natural Gas $47k 7.4k
MMBtu
$6.17

790

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.9k
MMBtu
3.0%
- Electrical $8.7k 186k
kWh
4.4%
- Natural Gas $0.9k -
MMBtu
-
Waste $1.2k
Productivity/Other $13k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall