ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Household furniture
3+ Characters Required for Products

232

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $392k 62k
MMBtu
$7.33
- Electrical $259k 4,182k
kWh
$0.061
- Natural Gas $46k 7.3k
MMBtu
$6.14

1,644

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 6.0k
MMBtu
9.7%
- Electrical $32k 588k
kWh
14.0%
- Natural Gas $7.9k -
MMBtu
-
Waste $7.9k
Productivity/Other $27k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

223

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $397k 63k
MMBtu
$7.22
- Electrical $263k 4,256k
kWh
$0.060
- Natural Gas $46k 7.4k
MMBtu
$6.13

781

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.9k
MMBtu
3.0%
- Electrical $8.8k 187k
kWh
4.4%
- Natural Gas $0.9k -
MMBtu
-
Waste $1.3k
Productivity/Other $13k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall