ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Furniture and fixtures
3+ Characters Required for Products

488

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $357k 55k
MMBtu
$8.61
- Electrical $217k 3,612k
kWh
$0.15
- Natural Gas $66k 11k
MMBtu
$5.89

3,547

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 5.0k
MMBtu
9.2%
- Electrical $28k 488k
kWh
13.5%
- Natural Gas $9.7k -
MMBtu
-
Waste $7.9k
Productivity/Other $29k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall

472

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $359k 55k
MMBtu
$8.56
- Electrical $219k 3,659k
kWh
$0.16
- Natural Gas $66k 11k
MMBtu
$5.82

1,707

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.8k
MMBtu
3.3%
- Electrical $9.6k 178k
kWh
4.9%
- Natural Gas $2.9k -
MMBtu
-
Waste $2.1k
Productivity/Other $13k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall